AN EXCLUSIVE US FIRST — AUGUST 13th & 14th, 2026
The World’s Only Flat-Packed Concrete Water Tank. Now in America.
Tank Depot is the exclusive United States partner for the Omni Series — the breakthrough concrete water tank trusted by the U.S. Army, UNICEF, and the World Food Programme. This is its US market debut. You are among the first to see it.


AN EXCLUSIVE US FIRST — AUGUST 13th & 14th, 2026
The World’s Only Flat-Packed Concrete Water Tank. Now in America.
Tank Depot is the exclusive United States partner for the Omni Series — the breakthrough concrete water tank trusted by the U.S. Army, UNICEF, and the World Food Programme. This is its US market debut. You are among the first to see it.


TANK DEPOT & DEPLOY — EXCLUSIVE US PARTNERSHIP
First in America. Only at Tank Depot.
The Omni Series vertical concrete water tank has been deployed across 10 countries and 5 continents — tested by the U.S. Department of Defense (DoD), trusted by the United Nations, and proven in the most demanding environments on earth. It has never been available in the United States. Until now.
Tank Depot holds the exclusive US distribution rights to the Omni Series. This event is the first and only opportunity to see a live installation in America before the product hits our shelves. No trade show. No distributor network.
One partner. One debut.
TANK DEPOT & DEPLOY — EXCLUSIVE US PARTNERSHIP
First in America. Only at Tank Depot.
The Omni Series vertical concrete water tank has been deployed across 10 countries and 5 continents — tested by the U.S. Department of Defense (DoD), trusted by the United Nations, and proven in the most demanding environments on earth. It has never been available in the United States. Until now.
Tank Depot holds the exclusive US distribution rights to the Omni Series. This event is the first and only opportunity to see a live installation in America before the product hits our shelves. No trade show. No distributor network.
One partner. One debut.
TWO DAYS · DRIPPING SPRINGS, TX
Watch It Go Up. Then Watch It Prove Itself.
Come for an hour or stay for both days. Here's how it unfolds.
Drop in for the sessions that matter to you. Can't make it in person? Register to receive the event’s highlights.


TWO DAYS · DRIPPING SPRINGS, TX
Watch It Go Up. Then Watch It Prove Itself.


Come for an hour or stay for both days. Here's how it unfolds.
Drop in for the sessions that matter to you. Can't make it in person? Register to receive the event’s highlights.
THE OMNI TECHNOLOGY
A Permanent Flat-Packed Concrete Water Tank.
The Omni Series is not a bladder. It is not a pillow tank. It is not poly or galvanised steel.
It is a genuine vertical concrete water tank — fibre-reinforced, chemical-resistant, and rated for 20 years of structural life — that ships flat on a single pallet, inflates to full operational height in 120 seconds, and cures into a permanent concrete shell overnight.
Two people. No cranes. No mixer trucks. Operational in 24 hours.


THE OMNI TECHNOLOGY
A Permanent Inflatable Concrete Tank That Ships in a Box.
The Omni Series is not a bladder. It is not a pillow tank. It is not poly or galvanised steel.
It is a genuine concrete water tank — fibre-reinforced, chemical-resistant, and rated for 20 years of structural life — that ships flat on a single pallet, inflates to full operational height in 120 seconds, and cures into a permanent concrete shell overnight.
Two people. No cranes. No mixer trucks. Operational in 24 hours.


AUGUST 13TH AND 14TH · DRIPPING SPRINGS, TX
This Is Not a Product Demo. This Is an Installation.
Most product events show you a video. This event puts the tank in front of you, from crate to concrete, in real time. You will watch every step — not on a screen, but on site.


The Omni 10 arrives in a single wooden crate you can move by hand. Watch the team unbox it, position it over the Insta-Slab foundation, and prepare the site — no machinery, no crew of ten.


Before the concrete water tank goes up, the foundation goes down. The Insta-Slab is a roll-out concrete base pad that installs in 30 minutes with a hammer and pegs. No excavation. No formwork. No concrete delivery. You will see it go from a roll to a hardened pad — and understand why it matters.


A standard 1.5hp blower fills the concrete fabric structure to full operational height in approximately 120 seconds. The moment it reaches full height, you understand why this changes everything.


Water activates the concrete-impregnated fabric. The hydration process is precise — two rounds of gentle spray, two rounds of pressurised mist. By the following morning, the shell reaches 8,700 psi compressive strength.


U.S. ARMY FUTURES COMMAND · SMEX '25 · FORT BARFOOT, VIRGINIA
Battle-Tested. DoD Assessed. Field-Proven.
The system maintained fluid integrity, offered ease of operation, and showed low energy and training burdens. Repairs were straightforward and conducted in a timely manner."
— U.S. Army Sustainment Capability Development
The Omni Series was assessed by the U.S. Army not because it was promising — but because it performed. SMEx '25 is the Army's live prototyping experiment for emerging sustainment technologies. The Omni Series passed every test. The Army's recommendation: continue integration testing at Brigade and Division level. This is the same tank coming to Dripping Springs on August 13th.
WHO THIS IS FOR
Built for Every Environment Where Water Storage Actually Matters.


Military and Tactical Operations
Combat-ready concrete infrastructure for forward operating bases — the same system currently trusted by the U.S. Department of Defense.


Agriculture and Irrigation
Rainwater harvesting and irrigation buffer storage without the construction delays, concrete trucks, or specialist crews that traditional tank installation demands.


Disaster Relief
High-capacity potable water systems established in under 24 hours — the tank-in-a-box logistics model that gets water to communities when infrastructure has failed.


Rural Development
The durability of a concrete shell at a price point that competes with plastic tanks — and a lifespan more than three times longer.


Residential and Property
Permanent concrete water storage for homes, ranches, and rural properties — installed in a day, without the disruption of excavation or a concrete pour in your yard.


Construction and Commercial
On-site water storage for job sites, developments, and commercial operations — flat-packed, stackable in the yard, and deployable exactly when and where the project needs it.
ALSO BEING DEMONSTRATED THE INSTASLAB
The Concrete Foundation That Installs in 30 Minutes
Every Omni Tank requires a stable, level base — and the Insta-Slab delivers one without excavation, formwork, or a concrete truck on site. It is a roll-out concrete foundation pad: unfold it, peg it, hydrate it. In 30 minutes you have a BBA-certified concrete base that is material-rated for 120 years of structural life.
The Insta-Slab is available independently of the Omni Tank and provides a compatible load-transfer base for any flat-bottom above-ground storage tank. It will be demonstrated live at the Dripping Springs event alongside the Omni 10 installation. Available in 9 ft x 9 ft and 9 ft x 7 ft configurations — and scalable to any footprint through overlapping and tiling.
ALSO BEING DEMONSTRATED THE INSTASLAB
The Concrete Foundation That Installs in 30 Minutes
Every Omni Tank requires a stable, level base — and the Insta-Slab delivers one without excavation, formwork, or a concrete truck on site. It is a roll-out concrete foundation pad: unfold it, peg it, hydrate it. In 30 minutes you have a BBA-certified concrete base that is material-rated for 120 years of structural life.
The Insta-Slab is available independently of the Omni Tank and provides a compatible load-transfer base for any flat-bottom above-ground storage tank. It will be demonstrated live at the Dripping Springs event alongside the Omni 10 installation. Available in 9 ft x 9 ft and 9 ft x 7 ft configurations — and scalable to any footprint through overlapping and tiling.
WHAT TO EXPECT ON SITE
Come Ready. The Installation Is Real.
This is a working installation event, not a trade show booth. The Omni Series will be unpacked, inflated, and hydrated on site during the event. Attendees are encouraged to get close, ask questions, and handle the material at every stage.
Come prepared for an outdoor environment.
The installation takes place rain or shine. Installation crew: minimum two adults per unit Surface: flat area cleared of sharp objects Utilities: standard power and water supply on site PPE: gloves, safety boots, and high-visibility gear recommended during active installation phases.


| Specification | Detail |
| Deployment Time | Fully inflated in approximately 2 minutes |
| Foundation | Rapid-deploy Insta-Slab |
| Curing process | Water hydration — Day 1 and Day 2 spray sequence |
| Compressive strength | 8,700 psi (60 MPa) at 24 hours |
| Available capacities | 530 gal / 1,320 gal / 2,640 gal / 5,280 gal / 7,920 gal |
| Max liquid operating temperature | 104°F (40°C) |
| Maintenance | Included reparation kit — vacuum plate and heat gun |
| CO₂ lifecycle | 1,874 lbs (850 kg) — lowest on the market |
| Design life | 20+ years |
August 13th and 14th, 2026. Dripping Springs, Texas. Only at Tank Depot.
Spots are limited. The installation happens once. The product is in stock and shipping from our Dripping Springs location from the date of the event.
August 13th and 14th, 2026. Dripping Springs, Texas. Only at Tank Depot.
Spots are limited. The installation happens once. The product is in stock and shipping from our Dripping Springs location from the date of the event.


